…as project documents still to be made public Kaieteur News – ExxonMobil Guyana Limited (EMGL) has paused oil production at the country’s second Floating Production Storage and Offloading (FPSO) vessel in the Stabroek Block, the Liza Unity, to facilitate the tie-in of infrastructure to transport gas onshore. The Government of Guyana (GoG) plans to utilize […]
The post Oil production paused at Liza Two to hookup gas pipeline appeared first on Kaieteur News.