Skip to content

At current rate of production oil in Liza 1 & 2 could be drained before 20-year lifespan

  • by

Kaieteur News – The Liza One and Liza Two projects in the Stabroek Block are both currently operating above the design rate outlined in the Field Development Plans (FDPs), sparking concerns about the early depletion of resources from the developments. Each project has a 20-year lifespan, but with American oil giant, ExxonMobil pushing the Floating […]

The post At current rate of production oil in Liza 1 & 2 could be drained before 20-year lifespan appeared first on Kaieteur News.

About The Author